Guinea 5000 t/d Gold Mine Ore Dressing Project

Guinea 5000 t/d Gold Mine Ore Dressing Project
Time:2026-01-13
  • Industry:
  • Region:Guinea
TEL
+86-13373916823
Customer Case Details

In terms of plant design, the scope of work includes: design of construction drawings for the processing plant, and design of the ore dressing plant production workshop, covering various disciplines such as ore dressing, water supply and drainage, power, civil engineering, and overall layout;



Guinea 5000 t/d Gold Mine Ore Dressing Project

The process flow includes: raw ore slurry preparation - grinding and classification - gravity separation - cyanide leaching - desorption and electrolysis;
The grinding and classification operation adopts a two-stage closed-circuit grinding process.  Slurry pumps and hydrocyclones are used for classification instead of traditional spiral classifiers, resulting in high grinding and classification efficiency, low power consumption, and low investment;


Gravity separation is performed using jig concentrators to separate the concentrate.

 

sales call
+86-13373916823
technology
+86-13373916823
Related Products
View more products
CTS Series Perm-magnetic Roller
output:10-280t/h
Feed size:/
Motor power:3-30kw
CTBSeries Perm-magnetic Roller S
output:10-280t/h
Feed size:/
Motor power:3-30kw
SF-type Flotation Machine
output:0.6-46m³/min
Feed size:/
Motor power:5.5-90kw
Vibrating Screen
output:20-750t/h
Feed size:/
Motor power:5.5-30kw
customer service Tel
Tel
+86-13373916823
WeChat
QR code
top
customer service Tel
Tel
+86-13373916823
WhatsApp
WhatsApp
top