Home Case

1500t/d Lithium Ore Beneficiation Project

1500t/d Lithium Ore Beneficiation Project
Time:2026-01-13
  • Industry:
  • Region:sichuan
TEL
+86-13373916823
Customer Case Details

This project is designed to process 1500 tons of lithium ore per day, targeting the efficient recovery of lithium minerals (such as spodumene or lepidolite). The flowsheet typically includes crushing, grinding, gravity separation, flotation, and concentrate dewatering stages. Advanced separation techniques—such as dense medium separation or multi-stage flotation—are often applied to achieve high-grade lithium concentrate. The final concentrate is filtered and dried for shipment, while tailings are managed through filtration or pumping to a storage facility. The plant emphasizes energy efficiency, water recycling, and automation for sustainable and cost-effective operation.



sales call
+86-13373916823
technology
+86-13373916823
Related Products
View more products
CTS Series Perm-magnetic Roller
output:10-280t/h
Feed size:/
Motor power:3-30kw
CTBSeries Perm-magnetic Roller S
output:10-280t/h
Feed size:/
Motor power:3-30kw
SF-type Flotation Machine
output:0.6-46m³/min
Feed size:/
Motor power:5.5-90kw
Vibrating Screen
output:20-750t/h
Feed size:/
Motor power:5.5-30kw
customer service Tel
Tel
+86-13373916823
WeChat
QR code
top
customer service Tel
Tel
+86-13373916823
WhatsApp
WhatsApp
top