Home Case

A 500 t/d gold ore processing project at a gold mine in Zimbabwe

A 500 t/d gold ore processing project at a gold mine in Zimbabwe
Time:2026-01-13
  • Industry:
  • Region:Zimbabwe
TEL
+86-13373916823
Customer Case Details

The gold mine in Zimbabwe has a relatively high gold grade in the raw ore, reaching 6 g/t. During the project implementation, comprehensive planning, rational layout, environmental protection, and safe production were prioritized. The construction period was strictly controlled, and high-quality services covering the entire mining industry value chain (EPC+M+O) were provided to the client.
The process flow includes: single-stage grinding - two-stage classification in a closed-circuit grinding system - gravity separation - cyanidation - desorption and electrolysis - smelting - tailings dewatering.


A 500 t/d gold ore processing project at a gold mine in Zimbabwe

sales call
+86-13373916823
technology
+86-13373916823
Related Products
View more products
CTS Series Perm-magnetic Roller
output:10-280t/h
Feed size:/
Motor power:3-30kw
CTBSeries Perm-magnetic Roller S
output:10-280t/h
Feed size:/
Motor power:3-30kw
SF-type Flotation Machine
output:0.6-46m³/min
Feed size:/
Motor power:5.5-90kw
Vibrating Screen
output:20-750t/h
Feed size:/
Motor power:5.5-30kw
customer service Tel
Tel
+86-13373916823
WeChat
QR code
top
customer service Tel
Tel
+86-13373916823
WhatsApp
WhatsApp
top