700 t/d Gold Ore Processing Project

700 t/d Gold Ore Processing Project
Time:2026-01-13
  • Industry:
  • Region:Malaysia
TEL
+86-13373916823
Customer Case Details

The natural minerals in this project include pyrite, quartz, calcite, and mica. The raw ore contains 4.70 g/t of gold, 4.63 g/t of silver, 20.10% iron, and 20.55% sulfur. The valuable element to be recovered is gold.


The grinding stage employs a two-stage closed-circuit grinding and classification process. The grinding product is screened through a de-sliming screen, and the undersize material flows by gravity to a thickener for concentration;


The thickener underflow is pumped to the leaching operation. After leaching, adsorption, and carbon recovery, a gold-bearing carbon product is obtained and transported to the existing gold refinery for processing;


The leaching tailings are dewatered using a filter press, and the recovered water is recycled. The dry tailings are transported to the tailings pond for storage.



 Environmental-friendly gold beneficiation equipment

 

sales call
+86-13373916823
technology
+86-13373916823
Related Products
View more products
CTS Series Perm-magnetic Roller
output:10-280t/h
Feed size:/
Motor power:3-30kw
CTBSeries Perm-magnetic Roller S
output:10-280t/h
Feed size:/
Motor power:3-30kw
SF-type Flotation Machine
output:0.6-46m³/min
Feed size:/
Motor power:5.5-90kw
Vibrating Screen
output:20-750t/h
Feed size:/
Motor power:5.5-30kw