TEL
13373916823
Home 贵金属行业

Guinea 5000 t/d Gold Mine Ore Dressing Project

Guinea 5000 t/d Gold Mine Ore Dressing Project
发布时间:2026-01-13
  • Industry:
  • Region:Guinea
TEL
13373916823
Customer Case Details

In terms of plant design, the scope of work includes: design of construction drawings for the processing plant, and design of the ore dressing plant production workshop, covering various disciplines such as ore dressing, water supply and drainage, power, civil engineering, and overall layout;



Guinea 5000 t/d Gold Mine Ore Dressing Project

The process flow includes: raw ore slurry preparation - grinding and classification - gravity separation - cyanide leaching - desorption and electrolysis;
The grinding and classification operation adopts a two-stage closed-circuit grinding process.  Slurry pumps and hydrocyclones are used for classification instead of traditional spiral classifiers, resulting in high grinding and classification efficiency, low power consumption, and low investment;


Gravity separation is performed using jig concentrators to separate the concentrate.

 

sales call
13373916823
technology
13373916823
Related Products
View more products
Pulse jet bag dust collector
output:/
Feed size:/
Motor power:/
Linear vibrating screen
output:/
Feed size:0.074-15 mm
Motor power:/
Powder  separator
output:16-130 t/h
Feed size:/
Motor power:7.5-45 kw
Screw conveyor
output:7-84 t/h
Feed size:/
Motor power:/