TEL
13373916823
Home 贵金属行业

700 t/d Gold Ore Processing Project

700 t/d Gold Ore Processing Project
发布时间:2026-01-13
  • Industry:
  • Region:Malaysia
TEL
13373916823
Customer Case Details

The natural minerals in this project include pyrite, quartz, calcite, and mica. The raw ore contains 4.70 g/t of gold, 4.63 g/t of silver, 20.10% iron, and 20.55% sulfur. The valuable element to be recovered is gold.


The grinding stage employs a two-stage closed-circuit grinding and classification process. The grinding product is screened through a de-sliming screen, and the undersize material flows by gravity to a thickener for concentration;


The thickener underflow is pumped to the leaching operation. After leaching, adsorption, and carbon recovery, a gold-bearing carbon product is obtained and transported to the existing gold refinery for processing;


The leaching tailings are dewatered using a filter press, and the recovered water is recycled. The dry tailings are transported to the tailings pond for storage.



 Environmental-friendly gold beneficiation equipment

 

sales call
13373916823
technology
13373916823
Related Products
View more products
Pulse jet bag dust collector
output:/
Feed size:/
Motor power:/
Linear vibrating screen
output:/
Feed size:0.074-15 mm
Motor power:/
Powder  separator
output:16-130 t/h
Feed size:/
Motor power:7.5-45 kw
Screw conveyor
output:7-84 t/h
Feed size:/
Motor power:/